Request a quoteBook a call

The cost-effective way to roll out branded refrigeration.

We buy direct from curated factories and add one margin, in the unit price. That price also covers our work on the whole rollout, from the first brief to the last POS. Freight, duty, storage and delivery are billed by third parties and passed on at cost, with the original invoice. No chain of resellers, no project fee, no markup on anyone else's bill. From one container up.

Fewer hands between factory and POS

Why we're cheaper.

A typical chain

Margins add up

  1. FactoryBuilds the unit
  2. A margin is added here.
    Trading companySells it on
  3. A margin is added here.
    ImporterBrings it in, holds stock
  4. A margin is added here.
    DistributorSells to you
  5. A margin is added here.
    YouBrand it, ship it, coordinate
  6. POSUnit on the floor

Each step adds its own margin. Freight and storage sit inside the price, so you never see them. Branding is usually a separate order.

One margin

  1. FactoryBuilds your batch
  2. A margin is added here.
    FOB priceUnit, branding and our work on all seven steps
  3. Freight · customs · storage · deliveryAt cost, with the original invoice
  4. POSUnit on the floor

One margin, in the unit price. Everything after loading with the original invoice.

What we coordinate

Seven steps. One team on all of them.

Up to loading in China, the unit and our work are in the FOB price. After that, we keep coordinating. Only the third parties' bills come on top, at cost. What happens at each step

Rancyne runs every step

  1. 01

    Brief & spec

    • FOB price
  2. 02

    Artwork & sample

    • FOB price
  3. 03

    Production

    • FOB price
  4. 04

    Inspection

    • FOB price
  5. 05

    Shipping

    • Loading: FOB price
    • We book the freight
    • Freight invoice, at cost

    Price line: Loaded

  6. 06

    Customs & storage

    • We brief the broker, book the hub
    • Their invoices, at cost
  7. 07

    Delivery to POS

    • We plan and book every delivery
    • Haulier's invoice, at cost

Our price ends when the units are loaded. Our work doesn't. Before you order, you get the FOB price fixed and an estimate of the at-cost lines. The final at-cost lines are the invoices.

  • FOB price
  • Third-party invoice, at cost

Honest limits

When we're not the cheaper option.

More on when Rancyne is not the right choice
  • You need units next week.

    We build to order. From the signed spec to the first POS takes 16–20 weeks.

  • You need a handful of units.

    Our model is built on full containers. Below that, the saving shrinks.

Ordering and price

Questions about price.

What is the minimum order?

Our prices are based on a full container of one model. Smaller and mixed orders are possible and quoted per project.

What does FOB mean?

Loaded on the vessel at the port in China. The FOB price covers the unit, your branding and our work on the whole rollout. Freight, duty, storage and delivery are billed by third parties and passed on at cost.

Can we mix models in one container?

Yes. Mixed containers are common in rollouts. We plan the load with you.

Are there costs we don't see in the quote?

No. The quote shows the FOB price per unit and an estimate for every at-cost line. You later receive each of those lines with the original invoice.

Can we use our own freight forwarder?

Yes. Freight is at cost anyway, so it makes no difference to our price.

Who is the importer?

Decided per project. We handle the paperwork either way.

Price your rollout in 30 minutes.

Tell us your POS, markets and timing. You leave with the units that fit, a price per unit and a first rollout plan.

Pick a time for your call

30 min · Teams · English or German

The live calendar comes from Pipedrive. It loads when you click, because Pipedrive sets cookies.Privacy notice

Prefer to write?sales@rancyne.com